Abstract
Hydro turbine units are large, awkward and assembled in place, and the alternative to a laser tracker is a lot of scaffolding and a lot of time. Jean-Francois Normand and Dany Lessard set out where a tracker earns its place in a hydro power plant – controlling assembly and welding of large components on site – and then get practical: on-site tests at large distances, on-site verification of the accuracy of level readings and an experiment to determine it, and a frank account of techniques, good practices and tips. The talk ends on the benefits, the limitations and the return on investment, which is the part most conference papers leave out.
Cite this paper
Jean-Francois Normand, Dany Lessard. Voith Hydro; Hydro Expertise. Presented at the Coordinate Metrology Systems Conference 2010, Reno, Nevada, July 12-16, 2010. Coordinate Metrology Society, reference CMS-2010-036.