
Abstract
The Combat System Alignment (CSA) survey for the AN/SPY-1 phased array radar system is a critical and complex task that takes place over multiple nights either onboard one of the over 100 ships or onsite at the Ballistic Missile Defense (BMD) facilities and Aegis shore sites worldwide. These ships and land-based sites are equipped with the AEGIS Combat System (ACS). The combat effectiveness of the ACS is dependent on the comprehensive and accurate completion of the surveying process.
The AN/SPY-1 is a passive electronic scanning 3-D radar system and a key component of the integrated naval weapon system known as the ACS. CGs and DDGs are naval warships equipped with the ACS and subsequently the AN/SPY-1 radar system. AN/SPY-1 system uses four large octagonal antennas. These connected antennas each provide 90 degrees of coverage and simultaneous tracking capability of 200 targets. To verify physical alignment, each antenna is surveyed independently using key fiducial points on each array against the ship’s common coordinate system and leveling plane. This produces the array’s definite orientation relative to the ship‘s references. The survey process is designed to measure element alignment errors which are afterward corrected maximizing opportunities for target detection-control-engagement.
During the survey, several measurements must be completed each with different tolerances and setup challenges. The survey is an extensive process requiring great technical knowledge of surveying, the Standard Operation Procedure (SOP) for surveying the AN/SPY-1 system, laser trackers, and the SpatialAnalyzer (SA) software used to operate the laser trackers. A Measurement Plan (MP) was written within SA to complete these periodic surveys standardizing the process and improving the measurement’s reliability. This specific MP, known as Radar Array Measurement Plan (RAMP), enables the various Navy CSA teams to complete each task while simultaneously tracking the status and checking against the tolerances.
RAMP’s automated solution provides a user-friendly interface that allows the operators to quickly decide what task to complete next. The RAMP suite standardizes the radar array survey procedure, simplifies the process, reduces the survey time, and automatically generates the final data reports. The main goals are to reduce user error, enforce procedural compliance, and reduce the time for surveying and training. It is compatible with all AN/SPY-1 arrays on Ticonderoga class of guided-missile cruisers (CG) and Arleigh Burke class of guided-missile destroyers (DDG). Naval Surface Warfare Center Port Hueneme Division (NSWC PHD), an organization of the United States Department of the Navy, is responsible for the deployment and maintenance of the RAMP to all Naval CSA activities worldwide, specifically Regional Maintenance Centers (RMCs).
Also published as CMSJ-14-1-01, The Journal of the CMSC, Volume 14, Number 1 (Spring 2019).
Cite this paper
Wilvin Crawford, Roianthony Navarro, Gary Vasiloff, Steven Seiler, Scott Sandwith. Naval Surface Warfare Center, Port Hueneme Division (NAVSEA), Port Hueneme, CA; New River Kinematics, Williamsburg, VA. Presented at the Coordinate Metrology Systems Conference 2018, Reno, Nevada, July 23-27, 2018. Coordinate Metrology Society, reference CMS-2018-001.
