Abstract
Underway at Argonne National Laboratory is a major upgrade of the Advanced Photon Source (APS), a premier national synchrotron radiation research facility. The project will replace the entire 1,104 m circumference APS storage ring accelerator sub-system, including 1,320 individual electromagnets of various types. To achieve the maximum permissible error (MPE) of 30 m RMS specified for magnet-to-magnet alignment, a method of magnet fiducialization that utilizes a rotating taut wire loop was developed. The rotating wire magnet fiducialization method, as well as a brief overview of the APS Upgrade project, will be presented.
Cite this paper
William Jansma, Chuck Doose, Scott Izzo, Animesh Jain. Advanced Photon Source Upgrade, Argonne National Laboratory, Argonne, IL. Presented at the Coordinate Metrology Systems Conference 2020, virtual conference, September 2020. Coordinate Metrology Society, reference CMS-2020-020.