Precision built Digital Twins for Nuclear Plants

Download
Members: $0.00
Non‑Members: $75.00
Buy Now

Publication Details

Published Date:
Authors: Brad Medlin, Charlie Boatwright, Donald Blackmon,
Download Format: PDF

Abstract

In the past when removing large components (for example a 9000HP Reactor Coolant Pump Motor) certain large objects previously identified and removed to replace the component were overly conservative and caused the additional work that was both unnecessary and costly in both time and resources. Retaining these objects in place as a result could possibly reduce costs and save the company money by maneuvering around them.